This is under construction. If you have useful links for this page, please let me know.
To receive Multihadron news and e-mail, send mail to majordomo@jlab.org
with the message body: subscribe multihadron
Bogus pions in (e,e'p pi-)
Cumulative Protons (Alexei Stavinskiy 3/99)
Vugraphs for Cracow Symposium (speaker: Kees deJager) (L. Weinstein June 1999)
E2 Run Group ECO (term runs until 9/01): Stepan Stepanyan
To receive E2 news and e-mail, send mail to majordomo@jlab.org with the message body: subscribe e2_run
Analysis of proton dE/dx cuts (A. Klimenko)
E2 Run Plan (Tentative) (as of 1/99)
Meeting Minutes January 15, 1999, (E2 and Multihadron Groups)
Shielding Study for Iron X-rays (updated 11 Dec, 1998) (25um Mo foil ordered 1/99)
Empty Target Studies (R. Niyazov) (e1 data 4.0 GeV)
e1 neutron detection efficiency studies
Solid Target Design: The cryotarget group under Dave Kashy has taken responsibility for design and construction of the solid targets for the e2 run. They have a preliminary design for a solid target mounted on a pivotting arm. The arm is controlled by a guided cable. The cable runs from the target arm, out of the scattering chamber, to a vacuum bellows operated by an air cylinder. In the relaxed position, the arm is parallel to the scattering chamber spine. In the deployed position, the target is in the beamline.
The scattering chamber with solid target mover.
Close-up of the solid target mover.
Last modified: Tue Jan 26 20:52:34 MET